Lymington

A Bennett Construction development of 66 apartments. Full fit out package comprising drylining, carpentery, paint, tiling and flooring(carpet and vinyl)

Dalston Western Curve

A Bennett Construction 102 High Spec units, internal and façade package- Dalston Curve, East London

Wenlock Rd and Brewery

A United House high spec development consisting of 104 units, a mixture of a one, two, three apartments and penthouses. JT Tudor’s contractual work on the project comprising drylining and SFS

Our company was founded in East London in 2004. Although starting up as a small business we quickly built a good reputation and started to grow. At present we have successful subcontracting collaborations with various small, medium and national main contractors.

For your piece of mind: All our tradesman hold NVQ's in their trade and our companies policy is that all our operatives must have a CSCS card, otherwise they will not be considered for a position with our company.

Our production team is well known for making sure projects are delivered in time and on budget. Our commercial department can estimate all types of contracts based on the top manufacturer's : British Gypsum, Knauf and Siniat.

Our projects include both new build and refurbishment works internally and externally.

Recent Projects
Why Choose Us

Our business approach

We believe every building project has its own particular features. When starting a new project our team takes in consideration all aspects of the build: architectural and technical details, logistics, health and safety, environmental impact and sustainability, production times and financial planning including finished products. Our experience tells us that this is the best way in which our services can be delivered to the highest standard.

We are a CHAS approved company

JT Tudor Ltd does not compromise on safety. All our operatives are being carefully vetted by our independent Health and Safety officer. We are continuously striving to maintain and improve our proven track record of working safely with emphasis on both personal and collective safety, while not forgetting the importance of environmental protection.

We are 'Approved Installers' for several façade systems

In order to make sure that our clients always get the best workmanship possible, all our façade operatives attend regularly training and practice courses in close collaboration with our façade manufacturers. We concentrate particularly on the substrate and insulation application but also on the finished façade texture to make sure that every customer gets the finished look they are hoping for, while not compromising on the performance of the overall system.

We offer as a standard warranties for all our works.

All our render and façade systems come with standard warranties issued by the manufacturers. The façade warranties vary between 10 to 20 years. There are also several warranties offered for all drylining, screeding and other façade products. The warranty period on these systems range from 5 to 25 years, depending on the overall systems used.

Need help? We are glad to answer you: contact@jttudor.co.uk

© Copyright 2013 JT Tudor.